Poseidon pram Ltd. P1 Set Up Tips


Attach all of the barge sections together before pinning the spud pockets to the sides of the barge. Lift the pocket with the crane attaching two shackles to the lifting eyes on the pocket. Connect the pocket to the side of the barge using the yellow pins. Poseidon pram Ltd. P1 yellow pins have a thicker web holding the pocket tight against the barge. Barge connection pins are blue. Drop de to gule ben ind i åbningen, dannet af støbegods at tillægge pram lommen.

Sænk spud på plads, efter at lommen er fastgjort. Den Spud er den langt rør bruges til at forankre prammen på plads. Løft Spud med en grund release bøjle for at eliminere en mand klatre en stige og risikere skade, mens frakobling af bøjle fra toppen af ​​Spud. Alternativet er at bruge en lang stiv flip og lade det hænge på Spud indtil projektet er afsluttet.

A tag line should be tied to the top rope thimble on the end of the barge to assist the crane operator while unloading and loading the trucks. Tagget linje bruges også til at trække pramme sammen under samling af dækket. When two barges are pulled together, a key hole opening is formed by adjacent castings on the sides or ends of the barges. EN 55 lb. blue pin is dropped into this opening engaging both the top and lower castings on the sides of the barge. Be careful not to pinch fingers under the pin when positioning the pins. Secure the barge deck to a near by tree or bridge peer during set up to assure that the platform does not float away in river currents.
Ved aflæsning spuds, hejs eller pram pusher enheder fra lastbilen, vedhæfte 4 lange chokers til støttebeslag på rammen af ​​spillet og pusher enheder & to chokers til spuds. Støt enheder med en kran linje forud for lastbilchauffør løsner og fjerne kæder eller stropper, der fastgør enheden til lastbilen. This will insure that the units do not slide off the truck causing injury to those in the immediate area and damage to the equipment. Chokers på spil & pusher units should be arranged so that the units remain level when they are picked by the crane insuring that diesel fuel does not spill into the water.
Tilmeld dig spændende
nyheder og produktopdateringer