Z Contractors Bridge Repair – Detroit, MI
Learn More
Eagle Beach Contractors Rides Poseidon to clean up after Hurricane Ian.
Nova Scotia was affected by the recent devasting hurricane that hit the East Coast of North America recently. Many boat owners found their vessels capsized or completely submerged.
Convenient location of Poseidon fleet assists Budrovich Marine
Our friends at Budrovich Marine push a spread of Poseidon P1 barges into position in Missouri.
Poseidon takes part in historic ship display
Poseidon takes part in historic ship displayThe LST-325 WWII Landing Ship Tank was the last fully operational ship in the US Fleet. The ship was built at the Philadelphia Ship Yards in 1942 and was part of the invasion on Normandy in June of 1944. Similar style ships were built in Evansville for the war. […]
Marine Solutions uses Poseidon P1 5ft barges
to perform maintenance at Byllersby Dam in Ivanhoe, VA.
Better By Design – Mark Twain Lake – South Fork Protection Project
Some great video footage of Better by Design performing the South Fork Protection project at Mark Twain Lake. Better by Design is a Brookfield, MO company that picked Poseidon Barge to supply their barge needs. Thank you for your business and for allowing us to be a part of this project!
Dredgit Corp Uses Poseidon P1 Barges in San Angelo
Dredgit Corporation recently used Poseidon P1 40x10x5 barges to support a Linkbelt 250-4 Long Reach Excavator on their project in San Angelo, TX.
D Construction using Poseidon P1 5ft barges
D Construction using Poseidon P1 5ft barges to support a diffuser operation and a pile driving rig.