D Construction using Poseidon P1 5ft barges
D Construction using Poseidon P1 5ft barges to support a diffuser operation and a pile driving rig.
D Construction using Poseidon P1 5ft barges to support a diffuser operation and a pile driving rig.
McKeil Marine used their Poseidon P1 5 ft tall barges to create a temporary road for crossing the Campbellford Generator. A 100’x40’ x 5’ Poseidon Barge deck was created and covered with crane mats.
Legacy Contracting continues their winning “legacy” using Poseidon P2 5 ft Barges. Legacy Contracting used Poseidon P2 5ft Barges on the Port Angeles, construction of the new Terminal 3 Headline Dolphin (a concrete structure supported by steel piling). It was the company’s second PDCA Project of the Year Award winner for 2018. Learn More
Ames Construction from Burnsville, MN works on the new bridge in Sandpoint, ID. They are using Poseidon P1 5 ft barges, and Poseidon P2 7ft barges to float their equipment.
Smith-Rowe Construction / Intercoastal Marine continues the demo on the existing US Hwy 701 Bridge in Elizabethtown, NC. They using a platform of Poseidon P2 7ft Sectional Barges to float their crane while performing the heavy lifting.
A beautiful picture of our long time customer, Sevenson Environmental Services, hard at work.
CR Meyer and Sons performs rehab work on the Wausua Hydro Dam. They are using Poseidon P1 barges as their platform. Special thanks to Mike Nault for his time during our visit to the site!
Canada Pump and Power has equipped the Poseidon P1 barges they purchased with this gantry crane. An awesome use of their Poseidon Barges!
Lunda Construction floats massive Manitowoc 18000 on Poseidon P-10’s in Davenport, IA Learn More
Lunda Construction Company
Headquartered in Black River Falls, WI
I-74 River Bridge project
Download the Current Product Brochure